The first number you need is field footage: the PEX that actually heats the floor. On this site, field length equals net heated area multiplied by feet of tube per square foot. Feet per square foot is 12 divided by the center-to-center spacing in inches, using the same factors as the calculator: 6 inch spacing uses 2.0 ft/sq ft, 8 inch uses 1.5, 9 inch uses 1.33, and 12 inch uses 1.0. A 1,000 sq ft room at 8 inch spacing therefore needs 1,000 × 1.5 = 1,500 ft of PEX in the floor itself, before you add anything else.
That field number is not what you should order. Every loop also has to travel to the manifold and back, and you should buy a waste allowance for loops, cuts, and layout adjustments. If you only buy 1,500 ft plus a little extra, you will come up short on a typical US basement or whole-home job.
Tighter spacing puts more tube in the floor, raises output, and evens out floor temperature. Wider spacing uses less tube and is common in lower-load areas. Eight-inch spacing is the common default on this site for average residential rooms. Use 6 inch spacing in bathrooms, poorly insulated rooms, or anywhere you need more output. Nine-inch spacing is a middle option at 1.33 ft/sq ft. Twelve-inch spacing suits lower loads such as a garage, if the heat loss calculation supports it. Floor covering matters too: tile runs hotter than thick carpet. See PEX spacing for radiant floors for a side-by-side comparison.
| Spacing | ft per sq ft | Field footage on 1,000 sq ft |
|---|---|---|
| 6" | 2.0 | 2,000 ft |
| 8" | 1.5 | 1,500 ft |
| 9" | 1.33 | 1,330 ft |
| 12" | 1.0 | 1,000 ft |
Use net heated area, not the raw room rectangle. Subtract cabinets, a kitchen island, a tub, a shower base, a built-in, or any other obstacle where tube will not be installed. The calculator does this by subtracting obstacle area from gross area in each room, then sizing loops from that net figure. Including unheated area makes you buy tube you cannot use and can push loop counts higher than the floor actually needs.
Every loop starts and ends at the manifold, so the trip is out and back. Transit for one loop is 2 × the one-way distance from the room to the manifold. If the manifold is 50 ft away, each loop carries 100 ft of supply and return just to reach the floor. That transit is added to every loop, not once for the whole system. A nine-loop room with a 50 ft run therefore carries 900 ft of transit footage before the 10% waste factor is applied.
Place the manifold as close to the rooms as you reasonably can. A long hallway run can use up most of the allowed loop length before the tube even enters the slab. The calculator flags a transit error when 2 × distance × 1.1 is already at or above the maximum loop length, because no amount of extra loops can fix a manifold that is too far away.
After field footage and transit are added, this calculator multiplies the per-loop length by 1.1. The 10% covers layout adjustments, bends, and a small purchasing margin so you are not short a coil at the end of a pour. Waste applies to the whole loop, including the transit tails, because those feet are cut from the same coil.
The per-loop formula used here is (field footage ÷ number of loops + 2 × manifold distance) × 1.1. The site then rounds each loop length to the nearest foot and multiplies by the loop count. Total order footage is rounded up to the nearest 10 ft for coil planning.
Use one 1,000 sq ft net room, 8 inch spacing, a 50 ft manifold distance, and 1/2 inch PEX. Field footage is 1,000 × 1.5 = 1,500 ft. The maximum loop length on this site for 1/2 inch PEX is 300 ft, including transit and waste.
The calculator finds the smallest whole number of loops n such that (1,500 / n + 100) × 1.1 is at most 300 ft. That first works at 9 loops. Each loop is then (1,500 / 9 + 100) × 1.1 = 293.3 ft, which the calculator rounds to 293 ft. Nine loops at 293 ft is 2,637 ft, and the displayed total PEX is 2,640 ft after rounding up to the nearest 10 ft.
Notice how far that is from a '1,500 ft plus a little extra' estimate. The nine loops add 9 × 100 ft of transit, and the 10% waste applies to both field and transit. Written another way, 1,500 × 1.1 + 9 × 100 × 1.1 = 1,650 + 990 = 2,640 ft. You need almost 1,140 ft more than the field footage alone.
The calculator sizes coils from 300, 500, and 1,000 ft rolls and picks a practical combination for the total. For this 2,640 ft example it recommends 3 × 1,000 ft coils. That leaves a little extra rather than leaving you short. Do not splice oxygen-barrier PEX in the slab; each loop should be a continuous run from manifold port to manifold port. If a coil plan would force a hidden splice, buy the next larger coil plan instead.
Open the PEX tubing calculator and enter your net area, spacing, PEX size, and the actual walk-off distance to the manifold. Add each room separately so loops are counted per room, not as one giant zone. Then read radiant floor loop length limits to see why the 300 ft and 200 ft caps exist. These estimates are for planning. Confirm the tubing manufacturer’s loop limits and have a licensed professional review the design before you buy or pour.
As an Amazon Associate I earn from qualifying purchases.
Enter your own rooms and get instant footage, loops, GPM, watts, or breaker results.
Open the PEX tubing calculator